Drainage velsertunnel

Other categories

Created at: 04 Apr 2017

Description

ARCADIS adjusted the standard rules for tunnel design to deal with future high impact storm water events. For the reconstruction of the tunnel, a new drainage system had to be developed. Modelling storm water events showed that the closed part of the tunnel suffered from rainfall in the open part of the tunnel when applying standard rules for tunnel drainage. We redesigned the drainage system of the tunnel with lateral gullies to prevent storm water flooding.

Help us provide more detailed information about this project by contributing!

Images

About the author

jill jongejan

• Submitted 8 projects

View all 8 projects by this author →

Downloads

No downloads added

Websites

No websites added

Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Water projects →