Vertical infiltration units Daalseweg - fase 1

Vertical Infiltration Units

Created at: 07 May 2017

Description

Between van Langeveldstraat and Hobbema straat are 10 units created. unit is a concrete well penetrated with 25 mm holes. units is surrounded by lager of drainage sand and geotextile.


Samenvatting (Dutch description)

Voor bestrijding van wateroverlast in het gebied zijn 10 grote infiltratiezakputten aangelegd met extra grote kolken. Het systeem kan ca 20 mm in een uur verwerken