La Grange du Bois 150 p.e.

Constructed Wetlands: Groundwater Treatment Plants (GWT)

Created at: 25 Aug 2016

Description

Municipality « LES BREVIAIRES » Hamlet « La Grange du Bois », Yvelines (78)<br>Wastewater treatment plant for 150 p.e., domestic sewage, separative sewerage system, constructed in 1994<br>Designed by SINT/SINBIO<br>“French sytem” treating raw unsettled sewage in a 2 stage vertical flow reed bed filter<br>1st stage 150 m² (350 m²), fed directly by pumping station after coarse, manual screening only<br>2nd stage 225 m² (3 50 m²), fed by a siphon installed inside the drainage layer of stage 1.

Help us provide more detailed information about this project by contributing!


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Water projects →