Combined SBR/ Wetland Treatment System at Lobetal

Constructed Wetlands: Groundwater Treatment Plants (GWT)

Created at: 25 Aug 2016

Description

Combined System (http://www.akut-umwelt.de/bin/gwt/lobetal)of SBR and Constructed Wetland.Reference site for high performance treatment system serving 3,000 p.e. The simple one stage sequencing batch reactor utilizes a 1,000 m² pond. It´s discharge passes a multistage subsurface and free water constructed wetland. Additionaly the surplus sludge is treated in sludge drying reed beds. The total system is optimized for nitrogen and phosphorus removal and hygienisation. The total energy consumption of 30 kWh/p.e./a is significantly low, regarding the size.Year of reconstruction: 2007

Help us provide more detailed information about this project by contributing!


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Water projects →