PKA Kloster Kirchberg

Constructed Wetlands: Groundwater Treatment Plants (GWT)

Created at: 25 Aug 2016

Description

Combined wastewater treatment of domestic wastewater from the cloisture at Kirchberg.The conventional activated sludge treatment plant is designed for 150 p.e. Because of hotel operation the daily flow rate is highly fluctuating from less than 100 up to 200 p.e. The additional vertical flow filter serves as safe guard for possible sludge disposal from the technical stage and as well as secondary treatment at peak flow rates.