Cable suspended bridge for safe access during river flooding

Problem Area - Flood Vulnerability

Created at: 15 May 2022

Description

  1. Bridge towers positioned at safe distance from maximum river flooding level with bridge span of 32m (tower to tower)

  2. Bridge towers built to required height, allowing safe distance between bridge and maximum river flood level

  3. Reinforced concrete anchor blocks built beneath ground to support weight of bridge

  4. 6 x 20mm IWRC cables tensioned to design and firmly fastened with 6 clamps on each join to ensure safety

  5. Concrete ramps built to allow easy access for pedestrians, motorbikes and livestock during all weather conditions

  6. Local eucalyptus urophylla timber decking and wire fencing to ensure safety of users

Help us provide more detailed information about this project by contributing!

About the author

Geert Westerhuis

• Submitted 227 projects
• Expert at Water
• Netherlands

View all 227 projects by this author →


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Climate Events - Learning From Trouble projects →