Construction of intake for uncapped spring and new piping from new intake to existing intake to increase total flowrate available to community during dry season
Rehabilitation of transmission pipeline, including replacement of 550m and replacing fittings for remaining sections
Installation of two new tanks with total capacity of 10,400L, connected with existing tank in parallel, to allow the community to store and manage large volumes of water during droughts
2.2km of new distribution pipeline
Construction of 6 new public tapstands and rehabilitation of 15 existing tapstands to ensure all houses in suco have adequate access to water