Citycore Solar Cebu - Toledo City, Cebu

Solar Park (land)

Created at: 23 Feb 2024

Description

Technical Description:

Location: Barangay Talavera, Toledo City, Cebu Province Service Contract: Citicore Solar Toledo, 60 MW Solar Power Generation (for 25 Years) Grid: Visayas Transmission Line: c.420 m; 69 kV Installed Capacity: 60.0 MWdc Inverter: Schneider Electric 550 - 800V DC – 380V AC, 1040A, 72 Inverters COD: 30 June 2016 Design Life: 30 years EPC Contractor(s): MCC O&M Contractor(s): CPI Grid Connections: Connection point to the NGCP grid through the 69 kV Calulng-Calulng substation​

PV Module Description:

No. of modules: 193,440 Manufacturer: BYD and Renesola Model: 310 Cell Type: Polycrystalline Silicon Peak Power Output: 310Wp Module Efficiency: 15.98/16.00% Power Tolerance: 0/+5Wp Temp Coefficient: -0.43% and -0.4%/°C

Each PV table is designed to have 2 rows of 20 PV modules each with 2.0 m row-to-row distance to enhance efficiency of the overall PV array​ Tier 1 rated and internally accredited and approved PV module suppliers were chosen based on bankability, warranty and availability of modules​

Help us provide more detailed information about this project by contributing!

Images

About the author

Ruben Matahelumual

• Submitted 821 projects
• Expert at Climate Events - Learning From Trouble
• Germany

View all 821 projects by this author →


Related projects

Below you will find the latest related projects in this category.

Show more related projects →

View all Energy (Climate Mitigation) projects →